Search
Duty overnight bag in the group Studio/Workspace /  /  at Pen Store (132399)
4

Duty overnight bag

£66.90
incl. VAT
 
Add to cart

Frequently Bought Together

More ProMarker Singles ProMarker Singles
188
Promarker
ProMarker Singles
£3.30
More ABT Dual Brush Pen ABT Dual Brush Pen
107
Tombow
ABT Dual Brush Pen
£3.70
More Ink 30ml Ink 30ml
105
Diamine
Ink 30ml
£4
More T 10 Fountain pen refills 5-pack T 10 Fountain pen refills 5-pack
7
Lamy
T 10 Fountain pen refills 5-pack
£2.70
  • Freight £2.90-9.90 (decided by order content)
  • Official retailer of all brands carried
  • Customer service at your disposal
  • TrustScore 4.6
A heavy-duty large shoulder bag, made to fit OD-11 and everything else. Internal pockets ensure you don't lose smaller items, with multiple straps to carry it by hand or over the shoulder. Made from durable polyester ripstop with tpu coating, it's tear-resistant and water-repellent.

Made from 100% recycled polyester ripstop with tpu coating, ensuring resistance to tearing and ripping. Handle made from recycled polyester webbing. Velcro close fastening.

Dimensions: 665 x 420 x 285 mm
Article nr: 132399

More from Studio/Workspace / /

More MC-3 PO sync cable 3-pack MC-3 PO sync cable 3-pack
Buy!
teenage engineering
MC-3 PO sync cable 3-pack
£16.50
More Textile cable 3.5mm to 2xRCA Textile cable 3.5mm to 2xRCA
Buy!
teenage engineering
Textile cable 3.5mm to 2xRCA
£21.50
More OP–Z Duty Case medium bag OP–Z Duty Case medium bag
Buy!
teenage engineering
OP–Z Duty Case medium bag
£25
More Field tote bag Field tote bag
Buy!
teenage engineering
Field tote bag
£24.90
More Field sync cable kit 150mm Field sync cable kit 150mm
Buy!
teenage engineering
Field sync cable kit 150mm
£29.90
More OB–4 Duty tote bag OB–4 Duty tote bag
Buy!
teenage engineering
OB–4 Duty tote bag
£50
More Duty overnight bag Duty overnight bag
Buy!
teenage engineering
Duty overnight bag
£66.90
Login

Our lowest price 1-30 days before price reduction:

NOTE. The price is the lowest price applied for the product 1-30 days before the current price reduction was implemented. The exception is if gradual reductions have been made, then the lowest price 1-30 days before the first price reduction is shown.